Not a CBCS member yet? Join now »
CBCS Comics
Not a CBCS member yet? Join now »
CBCS GradedCBCS Pressing

CBCS Pressing Update Vol 1, #215738

Collector Silversorrow private msg quote post Address this user
Quote:
Originally Posted by SteveRicketts
Standard tier orders from May are now completed in pressing and in the grading queue.
Wow! You guys just finished April 4 days ago and now you're done with May only 4 days later! That's awesome! Great news and tyvm for your hard work 😃!
Post 651 IP   flag post
Collector Batman79 private msg quote post Address this user
They are relatively quick at getting them in the queues. It's how they ensure they get paid. Mine has been sitting in queue since January 2022.... crickets since.
Post 652 IP   flag post
Collector Doneda42nd private msg quote post Address this user
Anyway I can get this order checked 22-1745766 it was submitted for pressing 4/26/2022 thank you.
Post 653 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Quote:
Originally Posted by Doneda42nd
Anyway I can get this order checked 22-1745766 it was submitted for pressing 4/26/2022 thank you.


Pressing for that order would have been completed a few weeks ago so it's now back in the grading queue for the applicable tier. I just today picked up two orders submitted for pressing on 2/15/22 so you've probably a month or so to go.
Post 654 IP   flag post
CBCS Pressing SteveRicketts private msg quote post Address this user
Quote:
Originally Posted by Doneda42nd
Anyway I can get this order checked 22-1745766 it was submitted for pressing 4/26/2022 thank you.


Your order is in the slab room. Shouldn't be here much longer.
Post 655 IP   flag post


CBCS Pressing SteveRicketts private msg quote post Address this user
Standard tier orders from June are now completed from pressing and moved into the grading queue.
Post 656 IP   flag post
Collector ratwoodster private msg quote post Address this user
Quote:
Originally Posted by SteveRicketts
Standard tier orders from June are now completed from pressing and moved into the grading queue.


Man you guys are just blazing through them now!
Post 657 IP   flag post
Collector Silversorrow private msg quote post Address this user
Yeah, they have gone through May and June in 4 days each. At that pace they could be caught up to today in 1.5-2 months.
Post 658 IP   flag post
I wish I had a title. ComicNinja0215 private msg quote post Address this user
This makes me happy 🤘😁
Post 659 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
Received notice today (in Bold below) that the 1st of my Modern submissions that was delivered for Press in August moved from Press to Grading.

EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks (just wasn't updated)

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29, In Grading notification 10/24 (press completed 8/1 or likely earlier). (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TATIn Shipping 11/09, Reverted back to In Grading so will probably in shipping this week 11/07, In HeatSeal 10/28, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7, Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]

Delivered to CBCS 9/20/21
#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - In Grading 2/20, In Pressing Room 8/22, Received 8/22

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


I will continue to update until completed.
Post 660 IP   flag post
CBCS Pressing SteveRicketts private msg quote post Address this user
Quote:
Originally Posted by ratwoodster
Quote:
Originally Posted by SteveRicketts
Standard tier orders from June are now completed from pressing and moved into the grading queue.


Man you guys are just blazing through them now!


Actually we had a few trouble orders that were lingering. I don't report the month as closed out until every order has been pressed and moved on. We are definitely moving faster, but not quite as fast as that made it appear.
Post 661 IP   flag post
I wish I had a title. ComicNinja0215 private msg quote post Address this user
Definitely seems like everything is doing better that it was. I'm excited.
Post 662 IP   flag post
CBCS Pressing SteveRicketts private msg quote post Address this user
Standard tier orders from July are now completed from pressing and moved into the grading queue.
Post 663 IP   flag post
Collector teacha777 private msg quote post Address this user
Quote:
Originally Posted by SteveRicketts
Standard tier orders from July are now completed from pressing and moved into the grading queue.


Is it low volume or has something improved? You guys are flying. Getting close to my October submission.
Post 664 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Quote:
Originally Posted by teacha777
Quote:
Originally Posted by SteveRicketts
Standard tier orders from July are now completed from pressing and moved into the grading queue.


Is it low volume or has something improved? You guys are flying. Getting close to my October submission.


Current thinking is that they're clearing it all out to give him time to work on RIPPED!

Or maybe it's just shrinking volumes and increased capacity.
Post 665 IP   flag post
Collector ratwoodster private msg quote post Address this user
Quote:
Originally Posted by teacha777
Quote:
Originally Posted by SteveRicketts
Standard tier orders from July are now completed from pressing and moved into the grading queue.


Is it low volume or has something improved? You guys are flying. Getting close to my October submission.


I think it's a bit of both. Steve had mentioned they had bought some more equipment and maybe brought on some people (?). But considering the TAT was like 400+ days during the Summer, I could see a lot of people (including me) holding off until it got better.
Post 666 IP   flag post
Collector popsleep private msg quote post Address this user
1 year and 2 months and finally got my books back all labeled and graded correctly and it was standard grading
Post 667 IP   flag post
No rust here... Nearmint67 private msg quote post Address this user
@SteveRicketts
Hey Steve,

Just took a look at the "pressing turn around times" on cbcs website.
Is this correct, or is it wishful thinking?
This is business days, right?

COMIC BOOK PRESSING
Current Turnaround Times
Tier Standard Express
New 50 20
Modern 50 20
Vintage 50 20
Post 668 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
Took my daily look at the "Print Invoice" hyperlink and found the update (in Bold below) For an August 2022 Press submission.

EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks (just wasn't updated)

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29, In Grading notification 10/24 (press completed 8/1 or likely earlier). (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TATIn Shipping 11/09, Reverted back to In Grading so will probably in shipping this week 11/07, In HeatSeal 10/28, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7, Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]

Delivered to CBCS 9/20/21
#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - In HeatSeal 3/2, In Labels 3/1, In Grading 2/20, In Pressing Room 8/22, Received 8/22.

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


I will continue to update until completed.
Post 669 IP   flag post
Collector Wbunn82 private msg quote post Address this user
How do we know if our order has been pressed? I was under the impression it took longer for pressed books then to just graded. I recurve a notice my order for books pressed was in process and now being mailed to me (great news). But books not pressed (22-2EFDDB1) have not need processed.


22-2F00D60 (supposed to be pressed)
22-2EFDDB1 (just graded)
Post 670 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
@Wbunn82 - that happens whereby pressed comics get placed into the grading queue ahead of similarly received grade only comics. Shouldn’t happen, but it does occasionally.

Now if a press order was for vintage comics only, and the grade only order had any modern comics, that would naturally tend to see the press order move faster.
Post 671 IP   flag post
CBCS Pressing SteveRicketts private msg quote post Address this user
@Wbunn82 Your order was pressed. Your other order is in the slab room, so it shouldn't be much longer before it ships.
Post 672 IP   flag post
CBCS Pressing SteveRicketts private msg quote post Address this user
Standard tier orders from August are now completed from pressing and moved into the grading queue.
Post 673 IP   flag post
Collector codychunn private msg quote post Address this user
Oops, posted over in the question thread.

23-0AB238C

was delayed due to financial issue that has been resolved. Am I back on schedule?
Post 674 IP   flag post
CBCS Pressing SteveRicketts private msg quote post Address this user
@codychunn Your book is in shipping.
Post 675 IP   flag post
Collector codychunn private msg quote post Address this user
WWAAAAAAAHHOOOOOOOOO!

THANK YOU!

Intend many more to come!
Post 676 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
Took my daily look at the "Print Invoice" hyperlink and found the updates (in Bold below) and got email that the last of my August 2022 Press submissions is in Grading.

EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks (just wasn't updated)

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29, In Grading notification 10/24 (press completed 8/1 or likely earlier). (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TATIn Shipping 11/09, Reverted back to In Grading so will probably in shipping this week 11/07, In HeatSeal 10/28, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7, Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]

Delivered to CBCS 9/20/21
#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Grading 3/9, In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In HeatSeal 3/8, In Labels 3/7, In Grading 3/6, In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - Completed/Ready for Pickup 3/7 = 28 1/2wk or 135 business day combined Press & Grade TAT, In HeatSeal 3/2, In Labels 3/1, In Grading 2/20, In Pressing Room 8/22, Received 8/22.

#-----7A3B-MD - 14 comics - In HeatSeal 3/9, In Labels 3/8, In Grading 3/8, In Pressing Room 8/23, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


I will continue to update until completed.
Post 677 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
Got email of another completed submission plus updating movement from the past week (in Bold below).

EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks (just wasn't updated)

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29, In Grading notification 10/24 (press completed 8/1 or likely earlier). (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TATIn Shipping 11/09, Reverted back to In Grading so will probably in shipping this week 11/07, In HeatSeal 10/28, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TAT, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7, Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]

Delivered to CBCS 9/20/21
#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined VSP, Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In HeatSeal 3/13, In Labels 3/10, In Grading 3/9, In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - Completed/Ready for Pickup 3/10 = 29wk or 138 business day combined Press & Grade TAT, In HeatSeal 3/8, In Labels 3/7, In Grading 3/6, In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - Completed/Ready for Pickup 3/7 = 28 1/2wk or 135 business day combined Press & Grade TAT, In HeatSeal 3/2, In Labels 3/1, In Grading 2/20, In Pressing Room 8/22, Received 8/22.

#-----7A3B-MD - 14 comics - Completed/Ready for Pickup 3/15 = 29wk or 141 business day combined Press & Grade TAT, In HeatSeal 3/9, In Labels 3/8, In Grading 3/8, In Pressing Room 8/23, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


I will continue to update until completed.
Post 678 IP   flag post
Collector teacha777 private msg quote post Address this user
Quote:
Originally Posted by SteveRicketts
@codychunn Your book is in shipping.


Up to 10/22 submissions yet?
Post 679 IP   flag post
CBCS Pressing SteveRicketts private msg quote post Address this user
ALL standard tier orders from 2022 and older are now completed from pressing and moved into the grading queue.

We are now pressing books from January 2023.
Post 680 IP   flag post
601329 761 30
Log in or sign up to compose a reply.