CBCS Pressing Update Vol 1, #215738
CBCS Pressing | SteveRicketts private msg quote post Address this user | |
@KatKomics You can use my updates for orders by month to guide you for those orders. We're not to that order yet. Give us a few weeks and ask again. | ||
Post 301 IP flag post |
Collector | Bobashek private msg quote post Address this user | |
Thank you @stevericketts, this is great news. | ||
Post 302 IP flag post |
Collector | Cerebus3000 private msg quote post Address this user | |
Quote:Originally Posted by SteveRicketts Thank you for the update! Sort of good news but...ouch...three months ago June orders were in progress. Hopefully you aren't still receiving three months of work for every calendar month of submissions. |
||
Post 303 IP flag post |
Collector | Rinova private msg quote post Address this user | |
Thank you for all your work @SteveRicketts on updating us on the status of our submissions. Much appreciated! | ||
Post 304 IP flag post |
CBCS Pressing | SteveRicketts private msg quote post Address this user | |
@Cerebus3000 June was indeed a big month for submissions. July was a little lighter. The good news is that Pressing has been hiring, training, and expanding which is ramping up our volume. Our plans are to have our employee count doubled and equipment tripled from where we are currently by July/August of this year. I want the pressing turnaround to eventually be down to 12 weeks for regular submissions and make that number maintainable going forward. CBCS has been hiring and expanding exponentially over the last year in ALL departments. The past several months have seen an even more incredible push for expanse, which is not going to stop for the foreseeable future. Just know that with all the people being hired, it takes a while for them to be trained to the point they are self sufficient and have the ability to significantly impact the volume we produce. I'm very excited by what's going on behind the scenes at CBCS. We have some amazing things coming over the next few months. Many things that have been a long time in the works. I know there is a lot of frustration, and I understand. Believe me, we want you to get your books back too, and I'm optimistic that we will have the pendulum swinging in the other direction very soon. Sorry for unloading, but I know you guys want to know there's a light at the end of the tunnel. There is. Be optimistic. I certainly am because I know what's coming. |
||
Post 305 IP flag post |
I don't believe this....and I know you don't care that I don't believe this. | GAC private msg quote post Address this user | |
@SteveRicketts Awesome to read!! Thanks for the update! | ||
Post 306 IP flag post |
It gets old smelling it everytime I go outside my door. | Nearmint67 private msg quote post Address this user | |
Quote:Originally Posted by GAC Ditto.... |
||
Post 307 IP flag post |
I award you no points! | stanley_1883 private msg quote post Address this user | |
Thank you | ||
Post 308 IP flag post |
Collector | Silverado private msg quote post Address this user | |
@SteveRicketts Just thought I would inquire about #21-2491FE0. Feeling it must be close now Thanks. |
||
Post 309 IP flag post |
Have I told you about the time I dropped off 3,000 comics at SDCC? | Scifinator private msg quote post Address this user | |
UPDATED 4/27 9:34am Pac So you can get a rough ideas as to where things stand, below are status updates on my 11 Modern w/Press submissions that were delivered to CBCS on June 8th in two separate boxes. (All standard, w/out any FAST P's and one with VSP added). 5 of the 11 had press completed in 44wks, 1 of the 11 had press completed in 45wks May 28, 2021 21-1DA4D21 30 Comics - In Pressing Room May 28, 2021 21-1DA3BBA 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, In Pressing Room May 28, 2021 21-1DA1FC5 30 Comics - In Pressing Room May 27, 2021 21-1D90B3E 60 Comics - In Pressing Room May 27, 2021 21-1D8FD6C 101 Comics - In Grading Room 4/11 May 27, 2021 21-1D8DDAD 31 Comics - In Grading Room 4/7 May 26, 2021 21-1D5943E 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4 May 25, 2021 21-1D2905B 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4 May 25, 2021 21-1D27E7E 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4 May 25, 2021 21-1D26C85 30 Comics - In Grading Room 4/5 May 25, 2021 21-1D24259 30 Comics w/2 VSP - In Pressing Room I will update occasionally until completed. |
||
Post 310 IP flag post |
Collector | wkolmel private msg quote post Address this user | |
Hey Steve, My order number is 21-2C930D1. I went to Torpedo Con in July 2021 and submitted two books to be graded that were signed at the con. I have tried contacting the company but the customer service number only lets me leave a message. I was told in July at the con that the turn around time would be about 3 months, it is now 9 months. Is there a way anyone can give me an update on my books? It would be greatly appreciated. I wanted to possibly submit more books in the future but I am on the fence due to the lack of customer service and questionable turn around times. Thanks. -Bill |
||
Post 311 IP flag post |
CBCS Pressing | SteveRicketts private msg quote post Address this user | |
@Silverado Pressing has started working on your order. @wkolmel Pressing has started working on your order. As for where we are, standard tier orders from June and before should all be out of pressing and in the grading queue now. |
||
Post 312 IP flag post |
Have I told you about the time I dropped off 3,000 comics at SDCC? | Scifinator private msg quote post Address this user | |
Quote:Originally Posted by SteveRicketts@SteveRicketts - Are your sure about that? |
||
Post 313 IP flag post |
Collector | Chewy private msg quote post Address this user | |
Quote:Originally Posted by Scifinator Its that freshly pressed looked for the case. |
||
Post 314 IP flag post |
Collector | Lonestar private msg quote post Address this user | |
Quote:Originally Posted by SteveRicketts @SteveRicketts Your updates are appreciated. Any chance you could get someone at CBCS to do something similar on the TAT thread so those of us that have older submission have a better sense of where we are in the grading queue? |
||
Post 315 IP flag post |
Collector | Silverado private msg quote post Address this user | |
Quote:Originally Posted by SteveRicketts Awesome. Thank you for the update. |
||
Post 316 IP flag post |
CBCS Pressing | SteveRicketts private msg quote post Address this user | |
Quote:Originally Posted by Scifinator Fixed. Thanks. |
||
Post 317 IP flag post |
CBCS Pressing | SteveRicketts private msg quote post Address this user | |
Quote:Originally Posted by Lonestar I'll see what I can do. |
||
Post 318 IP flag post |
Collector | Whynotv2 private msg quote post Address this user | |
@SteveRicketts I was wondering if you could keep an eye out for mine too and add to the update list please? 21-3172935 All I know is that it's out of signature verification (based on a message you sent me a while ago). Thanks |
||
Post 319 IP flag post |
Collector | Rinova private msg quote post Address this user | |
I think I'm 28 days away from submitting my comics 1 year ago. I wonder if I will receive them before the 1 year anniversary. Anticipation is killing me!!!! | ||
Post 320 IP flag post |
Have I told you about the time I dropped off 3,000 comics at SDCC? | Scifinator private msg quote post Address this user | |
UPDATED 5/10 2:03pm Pac So you can get a rough ideas as to where things stand, below are status updates on my 11 Modern w/Press submissions that were delivered to CBCS on June 8th in two separate boxes. (All standard, w/out any FAST P's and one with VSP added). 5 of the 11 had press completed in 44wks, 1 of the 11 had press completed in 45wks May 28, 2021 21-1DA4D21 30 Comics - In Pressing Room May 28, 2021 21-1DA3BBA 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, In Pressing Room May 28, 2021 21-1DA1FC5 30 Comics - In Pressing Room May 27, 2021 21-1D90B3E 60 Comics - In Pressing Room May 27, 2021 21-1D8FD6C 101 Comics - In Labels 5/10, In Grading Room 4/11 May 27, 2021 21-1D8DDAD 31 Comics - In Grading Room 4/7 May 26, 2021 21-1D5943E 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4 May 25, 2021 21-1D2905B 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4 May 25, 2021 21-1D27E7E 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4 May 25, 2021 21-1D26C85 30 Comics - In Grading Room 4/5 May 25, 2021 21-1D24259 30 Comics w/2 VSP - In Pressing Room I will update occasionally until completed. |
||
Post 321 IP flag post |
Collector | Rinova private msg quote post Address this user | |
My comics were received on June 6, 2021 and never left that Received status. | ||
Post 322 IP flag post |
Collector | Bobashek private msg quote post Address this user | |
@Rinova, my books went in 6/20 and according to Darryl, they are in grading so yours should be a little ahead of mine. | ||
Post 323 IP flag post |
Collector | Rinova private msg quote post Address this user | |
@Bobashek, Good to know. Mine had Press screening so I hope that doesn't add a lot of wait time to it. | ||
Post 324 IP flag post |
Have I told you about the time I dropped off 3,000 comics at SDCC? | Scifinator private msg quote post Address this user | |
@Rinova - Press screen won't add any to TAT. I believe Steve Ricketts mentioned that all orders through June have been pressed. 4 of my June 8th delivered submissions still do not reflect that they have moved to grading. So, as has been mentioned before, the Dashboard is not regularly updated. | ||
Post 325 IP flag post |
Collector | Rinova private msg quote post Address this user | |
@Scifinator Thank you for the update on Press Screen. Yes, I remember Steve Ricketts did say previously My June order should be finished being pressed soon. That was about 3 weeks ago. So I should assume my books are in the Grading waiting queue. I'm not even trying to figure out the TAT for grading. | ||
Post 326 IP flag post |
Collector | Rinova private msg quote post Address this user | |
Just peaked at the grading TAT for Modern, they are 224 days for Modern Standard. Does that mean my comics could be graded around December of this year? WOW! | ||
Post 327 IP flag post |
Collector | Wizardrex private msg quote post Address this user | |
Just looking for a general update on my orders. And what I should expect going forward. Order numbers and dates are as follows. -21-3A3F7FE created Oct 17th 2021, received by CBCS Oct 20th. Services purchased: Pressing, Grading and VSP. At time of purchase turnaround time for all services was 8 months. Based on turnaround time posted on the CBCS website. Expected return would be Mid- June 2022. -21-43BE979 created Dec 3rd 2021, received by CBCS Dec 7th. Services purchased: Pressing, Grading. At time of purchase turnaround time for all services was 12 months. Based on turnaround time posted on the CBCS website. Expected return would be early Dec 2022 If this is no longer the case. What is a reasonable approximate date that I should expect these orders returned. Thank You! |
||
Post 328 IP flag post |
Have I told you about the time I dropped off 3,000 comics at SDCC? | Scifinator private msg quote post Address this user | |
@Rinova - Tough to say. 4 of my 11 of my submissions that were delivered to MCS on June 8th have been completed. No doubt there was a new surge in March/April of people getting in ahead of the price increase, prompted CBCS in increase the estimated TAT. I suspect us with 2nd & 3rd qtr 2021 lower tier submissions will be ahead of the estimated TAT while 4th qtr 2021 and 1st/2nd qtr 2022 submissions may actually see that extended TAT. Keep an eye on the rest of my 7 June 8th submission updates. You will probably get yours back sometime before are completed or shortly thereafter. @Wizardrex - Based upon my June 8th submissions, one might think you would have them back this year. However, if the updated TAT estimates are indeed accurate based on the possibility of a surge that I referenced and the wide adoption of the new Express services, then you would be looking at late 2023. Hopefully not, as I have some 4th qtr 2021 and 1st qtr 2022 submissions also. |
||
Post 329 IP flag post |
Have I told you about the time I dropped off 3,000 comics at SDCC? | Scifinator private msg quote post Address this user | |
UPDATED by CBCS 5/13 12:51 Pac So you can get a rough ideas as to where things stand, below are status updates on my 11 Modern w/Press submissions that were delivered to CBCS on June 8th in two separate boxes. (All standard, w/out any FAST P's and one with VSP added). 5 of the 11 had press completed in 44wks, 1 of the 11 had press completed in 45wks May 28, 2021 21-1DA4D21 30 Comics - In Pressing Room May 28, 2021 21-1DA3BBA 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, In Pressing Room May 28, 2021 21-1DA1FC5 30 Comics - In Pressing Room May 27, 2021 21-1D90B3E 60 Comics - In Pressing Room May 27, 2021 21-1D8FD6C 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11 May 27, 2021 21-1D8DDAD 31 Comics - In Grading Room 4/7 May 26, 2021 21-1D5943E 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4 May 25, 2021 21-1D2905B 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4 May 25, 2021 21-1D27E7E 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4 May 25, 2021 21-1D26C85 30 Comics - In Grading Room 4/5 May 25, 2021 21-1D24259 30 Comics w/2 VSP - In Pressing Room I will update occasionally until completed. |
||
Post 330 IP flag post |