1) Delivered 9/07/21, Entered 11/04/21, Grading 5/19/22, Labels 6/4/22, Complete 6/15/22 (281 total days)
2) Delivered 9/07/21, Entered 11/04/21, Grading 5/19/22, Labels 6/4/22, Complete 6/24/22 (290 total days)
3) Delivered 9/08/21, Entered 11/08/21, Grading 6/03/22, Labels 6/8/22, Complete 7/08/22 (303 total days)
4) Delivered 9/17/21, Entered 11/12/21, Grading 5/19/22, Labels 6/18/22, Complete 6/20/22 (276 total days)
5) Delivered 9/20/21, Entered 11/11/21, Grading 7/06/22, Labels 8/13/22, Complete 8/26/22 (340 total days)

CGC Economy

1) Delivered 9/09/21, Entered 9/14/21, G/E/I 8/09/22, G/QC 8/19/22, Shipped 8/22/22. (349 total days)
2) Delivered 9/24/21, Entered 10/21/21, G/E/I 10/17/22, G/QC 10/24/22, Shipped 10/25/22. (396 total days)
Post 201 IP   flag post
Collector PhantomStranger271 private msg quote post Address this user
@ATComicCollector

My oldest order was received on December 22, 2021, so your post gives me hope.

Thanks for posting.
Post 202 IP   flag post
Collector lawguy1977 private msg quote post Address this user
Quote:
Originally Posted by lawguy1977
Quote:
Originally Posted by lawguy1977
Just got an update on my late November 2021 order. 5 modern books, no pressing. It entered grading today. Was logged in as received on December 22, 2021. As for the tracker, it says my order is in the "Invoicing" stage. So I'm guessing there's still some kinks to be worked out on that end, especially as my Feb 2022 order says it's in the "Production and Processing" stage but I've had no emails about it.


Update to my order 2021 order above. It entered heat seal yesterday and went into shipping today. The Tracker is correct now for the order as well. So TAT for the order was about 10 months from when they marked it received.


Last update -- just received confirmation that the books shipped today. Nothing too exciting, just some books I wanted to be able to display. I'll post pics once they arrive.
Post 203 IP   flag post
Collector Kinsella5 private msg quote post Address this user
Quote:
Originally Posted by ATComicCollector
For anyone seeking information regarding TAT for modern comics in the standard tier -- my comics were submitted to CBCS on December 21, 2021. I just received an email today (about 4 hours ago) that my comics have been graded, encapsulated, and are ready to be shipped.

It's been approximately 211 business days since my submission was received. Now, let's hope they are actually shipped out in a timely manner.


That is good news, congrats! Were they standard grade without pressing? I have an invoice of books there since December 4, 2021, no pressing either, all modern tier, so those I would assume should be done if they process in the order received.
Post 204 IP   flag post
Collector WalkinWillie private msg quote post Address this user
I have one order - 21-360B1D1 - of 210 modern pre-screens submitted on 9/26/2021 that is now in Billing so should be shipped within a week.

However I have another order - 21-2F2FAA9 - of 270 modern pre-screens submitted on 8/23/2021 that is still in Heatseal and has been for four months.

Kind of strange that a "younger" order of the same quantity magnitude is processed before the "older" one especially since the "older" one was in Grading and Heatseal several months before the "younger" one.

I still have a ton of books on other orders and asked CS to cancel them back at the first of September and other than a rep calling me to confirm that's what I want and the regional rep emailing me, I have heard crickets. Guess I'll have to get back on that horse again...
Post 205 IP   flag post


No rust here... Nearmint67 private msg quote post Address this user
@WalkinWillie unbeweebable... Frustration abounds...
Post 206 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through August of 2022.

Another Press & Grade on its way back to me in Bold below. Additionally, this is another submission that reverted from HeatSeal to Grading a day or so before “Shipping”

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----6D64-MD - 60 comics - In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - In Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - In Pressing Room

#-----EAC8-EX - 11 comics - In Pressing Room

#-----EAC8-MD - 17 comics - In Pressing Room

#-----BD64-EX - 2 comics - In Pressing Room

#-----BD64-MD - 39 comics - In Pressing Room

#-----8043-MD w/VSP - 14 comics - In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PRM - 1 comic - In Pressing Room 8/22, Received 8/22

#-----A0CC-V+ - 2 comics - In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - Received 8/22

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23

I will continue to update until completed.
Post 207 IP   flag post
COLLECTOR dielinfinite private msg quote post Address this user
1 Modern book, standard grading, no pressing


Delivered to CBCS: 02/07/22
Shipped Today: 10/28/22
Post 208 IP   flag post
Collector Kinsella5 private msg quote post Address this user
Quote:
Originally Posted by dielinfinite
1 Modern book, standard grading, no pressing

Delivered to CBCS: 02/07/22
Shipped Today: 10/28/22


Well so much for them processing in order of when they received. 28 books at CBCS 12/4/21, modern, no pressing, standard grading, still shows in processing. Congrats though on your book shipping hopefully you got yourself the grade you wanted, or higher.
Post 209 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Quote:
Originally Posted by Kinsella5
Well so much for them processing in order of when they received.


Sadly, size matters. The smaller the order, the faster it moves.
Post 210 IP   flag post
Collector Kinsella5 private msg quote post Address this user
Quote:
Originally Posted by figment
Sadly, size matters. The smaller the order, the faster it moves.


Unfortunately that doesn't seem to surprise me as much as I thought it would.
Post 211 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Quote:
Originally Posted by Kinsella5
Unfortunately that doesn't seem to surprise me as much as I thought it would.


I think it's just a matter of the smaller stuff getting sifted out faster. That's the only thing that makes any sense to me having witnessed it first hand with our own orders.
Post 212 IP   flag post
Collector SidTheSquid private msg quote post Address this user
Quote:
Originally Posted by figment
Quote:
Originally Posted by Kinsella5
Well so much for them processing in order of when they received.


Sadly, size matters. The smaller the order, the faster it moves.


This is absolutely correct. I imagine they look at it as a way of minimizing ticked off customers.
Post 213 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through August of 2022.

Another submission just reverted from HeatSeal to Grading, so my guess it goes to "Shipping" in a day or so plus some other updates in Bold below. And, as I mentioned yesterday in the Pressing thread, the last of my submissions that were delivered to CBCS on June 8th, 2021 has been completed.
That was the longest of my 2021 submissions with a combined Pressing & Grading TAT of 71 1/2 weeks or 343 Business. Color me skeptical, but I do believe that the stated non-express TATs are errantly calculated on a 7 day work week or they are purposefully inflated.

EDIT 1/2 6:30am - As predicted the submission that was reverted back to grading yesterday is now marked as Completed.

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - In HeatSeal 10/31, In Labels 10/29. In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----6D64-MD - 60 comics - In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TATIn Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - In Pressing Room

#-----EAC8-EX - 11 comics - In Pressing Room

#-----EAC8-MD - 17 comics - In Pressing Room

#-----BD64-EX - 2 comics - In Pressing Room

#-----BD64-MD - 39 comics - In Pressing Room

#-----8043-MD w/VSP - 14 comics - In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PRM - 1 comic - In Pressing Room 8/22, Received 8/22

#-----A0CC-V+ - 2 comics - In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - Received 8/22

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23

I will continue to update until completed.
Post 214 IP   flag post
Collector The_IronJedi private msg quote post Address this user
Day 233... no news. All modern. pre-screen & Grade only.

Response from inquiry to customer service regarding no updates: "Orders were received and routed to pre-grade in March."


Post 215 IP   flag post
No rust here... Nearmint67 private msg quote post Address this user
22-1EE8F40-MN
Shipped to CBCS on 6.4.22
Received at CBCS on 6.6.22
Received email from CBCS on 6.9.22
Today received email

Good news! Your book(s) are now in the grading room and will be examined by the CBCS Grading Team shortly!

30 books total (grade only, no press)
18 moderns
11 new
1 vintage
Post 216 IP   flag post
No rust here... Nearmint67 private msg quote post Address this user
Quote:
Originally Posted by Nearmint67
22-1EE8F40-MN
Shipped to CBCS on 6.4.22
Received at CBCS on 6.6.22
Received email from CBCS on 6.9.22
Today received email

Good news! Your book(s) are now in the grading room and will be examined by the CBCS Grading Team shortly!

30 books total (grade only, no press)
18 moderns
11 new
1 vintage


Emailed update

Your 22-1EE8F40-MN is graded and now it is time to get the comics into a CBCS case! Your tier has entered the production area of the company and will only be here a short time before it ships out!
Post 217 IP   flag post
No rust here... Nearmint67 private msg quote post Address this user
Quote:
Originally Posted by Nearmint67
Quote:
Originally Posted by Nearmint67
22-1EE8F40-MN
Shipped to CBCS on 6.4.22
Received at CBCS on 6.6.22
Received email from CBCS on 6.9.22
Today received email

Good news! Your book(s) are now in the grading room and will be examined by the CBCS Grading Team shortly!

30 books total (grade only, no press)
18 moderns
11 new
1 vintage


Emailed update

Your 22-1EE8F40-MN is graded and now it is time to get the comics into a CBCS case! Your tier has entered the production area of the company and will only be here a short time before it ships out!


Emailed update just received

Your following CBCS submissions are ready for pickup at the CBCS office:

22-1EE8F40-MN
Post 218 IP   flag post
I hear their hourly rate is outrageous! sportshort private msg quote post Address this user
Quote:
Originally Posted by Nearmint67
Quote:
Originally Posted by Nearmint67
Quote:
Originally Posted by Nearmint67
22-1EE8F40-MN
Shipped to CBCS on 6.4.22
Received at CBCS on 6.6.22
Received email from CBCS on 6.9.22
Today received email

Good news! Your book(s) are now in the grading room and will be examined by the CBCS Grading Team shortly!

30 books total (grade only, no press)
18 moderns
11 new
1 vintage


Emailed update

Your 22-1EE8F40-MN is graded and now it is time to get the comics into a CBCS case! Your tier has entered the production area of the company and will only be here a short time before it ships out!


Emailed update just received

Your following CBCS submissions are ready for pickup at the CBCS office:

22-1EE8F40-MN


I'm guessing "fast pass"?
Post 219 IP   flag post
No rust here... Nearmint67 private msg quote post Address this user
@sportshort No sir, slow (not as slow) train.
Post 220 IP   flag post
Collector Batman79 private msg quote post Address this user
Let's play a game...let's see if I get my 2022 Baltimore CGC books back before my 2021 Baltimore CBCS books. Neither order had pressing as I did that duty. Clock has already started ticking...Tick tock, tick tock.
Post 221 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
Quote:
Originally Posted by Scifinator
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through August of 2022.

Another submission just reverted from HeatSeal to Grading, so my guess it goes to "Shipping" in a day or so plus some other updates in Bold below.

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - In HeatSeal 10/31, In Labels 10/29. In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----6D64-MD - 60 comics - In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TATIn Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - In Pressing Room

#-----EAC8-EX - 11 comics - In Pressing Room

#-----EAC8-MD - 17 comics - In Pressing Room

#-----BD64-EX - 2 comics - In Pressing Room

#-----BD64-MD - 39 comics - In Pressing Room

#-----8043-MD w/VSP - 14 comics - In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PRM - 1 comic - In Pressing Room 8/22, Received 8/22

#-----A0CC-V+ - 2 comics - In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - Received 8/22

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23

I will continue to update until completed.
Post 222 IP   flag post
Collector hoodis67 private msg quote post Address this user
Submitted a modern set (w/pressing) to both CGC and CBCS on the same day in March 2022 (no fast pass) The CGC books are graded, and have shipped as of yesterday. CBCS still processing, and nobody will respond to any emails. Pretty much all I need to know.
Post 223 IP   flag post
Collector Batman79 private msg quote post Address this user
I always feel like we need to send Darth Vader like in the beginning of Jedi. Just erase anything he says about the death star and replace it with CBCS slabbing. Watch the scene and tell me I am wrong!
Post 224 IP   flag post
Collector Dart1146 private msg quote post Address this user
If the printable invoice for my order previously stated "Pressing" and now just says "Received" does that mean that my book has finished pressing and should be on its way to the grading queue?

The order was created late November 2021.
Post 225 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
@Dart1146 - Could be. Sometimes when the submission is moving between stages, I have seen oddities like that. The most common invoice change I see is moving from HeatSeal back to Grading within a day of so of moving to shipping.
Post 226 IP   flag post
Collector Dart1146 private msg quote post Address this user
@Scifinator Cool. Thank you for the response!
Post 227 IP   flag post
No rust here... Nearmint67 private msg quote post Address this user
@Dart1146 Welcome to the forum. Make sure you show your books when you get them back...
Post 228 IP   flag post
Collector Dart1146 private msg quote post Address this user
@Nearmint67 Will do, just 2 books though as I am just a small collector who collects cool covers and George Perez books more than anything. The exciting one is a Tomb of Dracula 10 that I picked up in 2010ish and the other is a New Suicide Squad: Futures End #1.
Post 229 IP   flag post
I'm good with splotches. Nuffsaid111 private msg quote post Address this user
It appears that the Clark Gregg signing has been completed from back in May.
I just got an email from CBCS (Saturday again... bravo to those working Sat), that my comic has completed grading for the Clark Gregg signing.
Post 230 IP   flag post
601310 994 30
Log in or sign up to compose a reply.