Not a CBCS member yet? Join now »
CBCS Comics
Not a CBCS member yet? Join now »
I don't want to brag, but cashiers are always checking me out. power_struggle55 private msg quote post Address this user
Modern comic (no press). Submitted June 24th, 2022, received: August 15th, 2022, email saying hit grading table Feb 22nd 2023, Labels stage Feb 22 2023, Hotseal Feb 23 2023, Shipped Mar 2nd 2023, delivered Mar 5th, 2023

New comic (no press) Submitted June 24th, 2022, received: August 15th, 2022, email saying hit grading table Feb 22nd 2023, Labels stage Feb 22 2023, Hotseal Feb 23 2023, Shipped Mar 2nd 2023, delivered Mar 5th, 2023

New Comic (No press) Submitted June 24th, 2022, received: August 15th, 2022, email saying hit grading table Feb 22nd 2023, Labels stage Feb 22 2023, Hotseal Feb 23 2023, Shipped Mar 2nd 2023, delivered Mar 5th, 2023
Post 626 IP   flag post
If the viagra is working you should be well over a 9.8. xkonk private msg quote post Address this user
@consumetheliving I see it after you enter a book. When you're on the page with your list of books to submit, at the top there are dropdowns for speed (standard/priority/express) and pressing (none/regular/express).
Post 627 IP   flag post
Collector consumetheliving private msg quote post Address this user
Quote:
Originally Posted by xkonk
@consumetheliving I see it after you enter a book. When you're on the page with your list of books to submit, at the top there are dropdowns for speed (standard/priority/express) and pressing (none/regular/express).


Thank you, I will give it a look tonight. Got some sigs I would like verified.
Post 628 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through January 2023.

Received email notification on a grade only submission, in "Bold" below plus, updating on another submission with change from last week.

CR = Comic ReHolder
EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Some quick factoids on mid-2021 submissions:

33 Separate submissions
- 28 Press & Grade Submissions
- 1 VSP, Press & Grade Submission
- 4 Grade only Submissions

The longest TAT of my grade only was <51 wks or 244 Business days.
The longest TAT for combined Press & Grade was only 71 1/2 wks or 343 Business days.
The Shortest TAT for combined Press & Grade was 44 wks or 213 Busisness days.
The funny thing is, that both the longest and shortest TATs came from submissions that were delivered to CBCS on the same day on June 8th. [/b]

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29. In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)
#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TAT, In Shipping 11/09, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/7, In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TATIn Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7In Shipping 11/7,[/b] Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - In HeatSeal 3/02, In Labels 3/01, In Grading 2/20, In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - In Grading 3/06, Received 8/22

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----C0E9-CR - 1 comic ReHolder - Completed/Shipped 1/10, Received 1/6

#-----AD21-CR - 6 comics ReHolder - Completed/Ready for Pickup 1/11, Received 1/3

#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In HeatSeal 2/14, In Grading 2/10 (that's a 5 wk or 27 business day Press TAT), In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


Delivered to CBCS 11/15/2021 (Yes, 2021. This is a submission of 66 Magazines that were sent to Joe at CFP Comics for Pressing and he was going to re-forward to cgc for grading. After a conversation with Steve Borock, I decided to have CFP send to CBCS as I was not in a hurry to have them back and 5 1/2 dozen would be a good batch for CBCS to run through and iron out the process of Magazine encasement. "Test Dummies" is how I referred to them. Thank you again Joe for your agreeing to alter the forwarding after you completed your Pressing services. Well, there has been movement at CBCS this past week.)

#-----D0D2-MAG - 66 magazines VSP and Grade only - In Labels 2/28, In Grading 2/26, 2/16 Reverted to Received, 2/10 in ImagingSP (Probably for VSP), 2/10/23 Official Received email from CBCS.

I will continue to update until completed.
Post 629 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Reholder (for rivet removal) Received: 2/15/23, Complete: 3/7/23 (20 total days)
Post 630 IP   flag post


Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
Quote:
Originally Posted by figment
(for rivet removal)
@figment -
Post 631 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through January 2023.

Received email notification on a Press & Grade submission completion from August, in "Bold" below,(that equals a 135 Combined Press & Grade TAT compared to the current estimate of 230 business days...Nice!), plus updating on another submission based on daily "Print Invoice" review.

CR = Comic ReHolder
EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Some quick factoids on mid-2021 submissions:

33 Separate submissions
- 28 Press & Grade Submissions
- 1 VSP, Press & Grade Submission
- 4 Grade only Submissions

The longest TAT of my grade only was <51 wks or 244 Business days.
The longest TAT for combined Press & Grade was only 71 1/2 wks or 343 Business days.
The Shortest TAT for combined Press & Grade was 44 wks or 213 Busisness days.
The funny thing is, that both the longest and shortest TATs came from submissions that were delivered to CBCS on the same day on June 8th. [/b]

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29. In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)
#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TAT, In Shipping 11/09, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/7, In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TATIn Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7In Shipping 11/7,[/b] Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - Completed/Ready for Pickup 3/7 = 28 1/2wk or 135 business day combined Press & Grade TAT, In HeatSeal 3/02, In Labels 3/01, In Grading 2/20, In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - In Labels 3/7, In Grading 3/06, Received 8/22

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----C0E9-CR - 1 comic ReHolder - Completed/Shipped 1/10, Received 1/6

#-----AD21-CR - 6 comics ReHolder - Completed/Ready for Pickup 1/11, Received 1/3

#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In HeatSeal 2/14, In Grading 2/10 (that's a 5 wk or 27 business day Press TAT), In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


Delivered to CBCS 11/15/2021 (Yes, 2021. This is a submission of 66 Magazines that were sent to Joe at CFP Comics for Pressing and he was going to re-forward to cgc for grading. After a conversation with Steve Borock, I decided to have CFP send to CBCS as I was not in a hurry to have them back and 5 1/2 dozen would be a good batch for CBCS to run through and iron out the process of Magazine encasement. "Test Dummies" is how I referred to them. Thank you again Joe for your agreeing to alter the forwarding after you completed your Pressing services. Well, there has been movement at CBCS this past week.)

#-----D0D2-MAG - 66 magazines VSP and Grade only - In Labels 2/28, In Grading 2/26, 2/16 Reverted to Received, 2/10 in ImagingSP (Probably for VSP), 2/10/23 Official Received email from CBCS.

I will continue to update until completed.
Post 632 IP   flag post
It was a one trick pony show but always hilarious. GAC private msg quote post Address this user




Post 633 IP   flag post
Collector xvipah private msg quote post Address this user
I gave them to the end of last week, and even through yesterday. No response from CS... again. So, I've once again emailed them asking for a status, we'll see how it goes.


Quote:
Originally Posted by xvipah
Got an email from CS back yesterday finally. They apologized for the delay. Said they were looking for the submission so they could send it back to me (which leads me to believe it really was going to be 2.5 years from submission, I think it was a really weird quirk of the way it was done because I've never had any other submission take more than 10-11 months). So they asked me to give them to the end of the week to get back to me.
Post 634 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
Quote:
Originally Posted by Scifinator
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through January 2023.

With my daily "Print Invoice" review, saw 2 submissions move to "HeatSeal" in "Bold" below.

CR = Comic ReHolder
EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Some quick factoids on mid-2021 submissions:

33 Separate submissions
- 28 Press & Grade Submissions
- 1 VSP, Press & Grade Submission
- 4 Grade only Submissions

The longest TAT of my grade only was <51 wks or 244 Business days.
The longest TAT for combined Press & Grade was only 71 1/2 wks or 343 Business days.
The Shortest TAT for combined Press & Grade was 44 wks or 213 Busisness days.
The funny thing is, that both the longest and shortest TATs came from submissions that were delivered to CBCS on the same day on June 8th. [/b]

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29. In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)
#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TAT, In Shipping 11/09, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/7, In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TATIn Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7In Shipping 11/7,[/b] Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - In HeatSeal 3/8, In Labels 3/7, In Grading 3/6, In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - Completed/Ready for Pickup 3/7 = 28 1/2wk or 135 business day combined Press & Grade TAT, In HeatSeal 3/02, In Labels 3/01, In Grading 2/20, In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - In HeatSeal 3/8, In Labels 3/7, In Grading 3/06, Received 8/22

#-----7A3B-MD - 14 comics - In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----C0E9-CR - 1 comic ReHolder - Completed/Shipped 1/10, Received 1/6

#-----AD21-CR - 6 comics ReHolder - Completed/Ready for Pickup 1/11, Received 1/3

#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In HeatSeal 2/14, In Grading 2/10 (that's a 5 wk or 27 business day Press TAT), In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


Delivered to CBCS 11/15/2021 (Yes, 2021. This is a submission of 66 Magazines that were sent to Joe at CFP Comics for Pressing and he was going to re-forward to cgc for grading. After a conversation with Steve Borock, I decided to have CFP send to CBCS as I was not in a hurry to have them back and 5 1/2 dozen would be a good batch for CBCS to run through and iron out the process of Magazine encasement. "Test Dummies" is how I referred to them. Thank you again Joe for your agreeing to alter the forwarding after you completed your Pressing services. Well, there has been movement at CBCS this past week.)

#-----D0D2-MAG - 66 magazines VSP and Grade only - In Labels 2/28, In Grading 2/26, 2/16 Reverted to Received, 2/10 in ImagingSP (Probably for VSP), 2/10/23 Official Received email from CBCS.

I will continue to update until completed.
Post 635 IP   flag post
Collector GeekDragon private msg quote post Address this user
I posted 2 weeks ago saying my 2 books were stuck on verification and grading for a few months. I emailed them the same day asking what is going on with my books. This seemed to wake them up. It seemed like they forgot about my books and when they got my e-mail, my books were fast tracked and I got my books back today, and this is with signature verification.

So, if your order seems to be taking longer then it should be(they told me 6 months back in July, which means I should have had them back in January), send them a nice e-mail asking what is going on,
Post 636 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through January 2023.

Received a Completed/Ready for Pickup email this morning, plus, with my daily "Print Invoice" review, saw some movement on August 22 submissions in "Bold" below.

CR = Comic ReHolder
EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Some quick factoids on mid-2021 submissions:

33 Separate submissions
- 28 Press & Grade Submissions
- 1 VSP, Press & Grade Submission
- 4 Grade only Submissions

The longest TAT of my grade only was <51 wks or 244 Business days.
The longest TAT for combined Press & Grade was only 71 1/2 wks or 343 Business days.
The Shortest TAT for combined Press & Grade was 44 wks or 213 Busisness days.
The funny thing is, that both the longest and shortest TATs came from submissions that were delivered to CBCS on the same day on June 8th. [/b]

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29. In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)
#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TAT, In Shipping 11/09, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/7, In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TATIn Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7In Shipping 11/7,[/b] Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In Labels 3/10, In Grading 3/9, In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - Completed/Ready for Pickup 3/10 = 29wk or 138 business day combined Press & Grade TAT , In HeatSeal 3/8, In Labels 3/7, In Grading 3/6, In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - Completed/Ready for Pickup 3/7 = 28 1/2wk or 135 business day combined Press & Grade TAT, In HeatSeal 3/02, In Labels 3/01, In Grading 2/20, In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - In HeatSeal 3/8, In Labels 3/7, In Grading 3/06, Received 8/22

#-----7A3B-MD - 14 comics - In HeatSeal 3/9, In Labels 3/8, In Grading 3/8, In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----C0E9-CR - 1 comic ReHolder - Completed/Shipped 1/10, Received 1/6

#-----AD21-CR - 6 comics ReHolder - Completed/Ready for Pickup 1/11, Received 1/3

#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In HeatSeal 2/14, In Grading 2/10 (that's a 5 wk or 27 business day Press TAT), In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


Delivered to CBCS 11/15/2021 (Yes, 2021. This is a submission of 66 Magazines that were sent to Joe at CFP Comics for Pressing and he was going to re-forward to cgc for grading. After a conversation with Steve Borock, I decided to have CFP send to CBCS as I was not in a hurry to have them back and 5 1/2 dozen would be a good batch for CBCS to run through and iron out the process of Magazine encasement. "Test Dummies" is how I referred to them. Thank you again Joe for your agreeing to alter the forwarding after you completed your Pressing services. Well, there has been movement at CBCS this past week.)

#-----D0D2-MAG - 66 magazines VSP and Grade only - In Labels 2/28, In Grading 2/26, 2/16 Reverted to Received, 2/10 in ImagingSP (Probably for VSP), 2/10/23 Official Received email from CBCS.

I will continue to update until completed.
Post 637 IP   flag post
COLLECTOR dielinfinite private msg quote post Address this user
Order received July 25th:

5 Moderns entered grading today 3/10
1 Vintage still waiting
Post 638 IP   flag post
COLLECTOR dielinfinite private msg quote post Address this user
Order received July 25th:

5 Moderns entered grading today 3/10
1 Vintage entered grading today 3/10
Post 639 IP   flag post
I'm good with splotches. Nuffsaid111 private msg quote post Address this user
Yep... my early August books are: one in grading; one in shipping.

So it looks like Modern (no press) books from late July to mid August are being tapped
Post 640 IP   flag post
Collector Lobofan private msg quote post Address this user
one from Sept modern press and grade is supposed to be delivered to me tomorrow. So its much earlier than originally expected. On that they received a month earlier had been in pressing, but went back to "received" a week or so ago, has not changed to grading. Guess I'll try to contact them some time next week if It still hasn't changed. All of my submissions have been me handing them to their rep at Con.'s .
Post 641 IP   flag post
Have I told you about the time I dropped off 3,000 comics at SDCC? Scifinator private msg quote post Address this user
For those coming to this thread for actual information which may give you an idea of Grade only and Press & Grade TATs, with a couple of VSP thrown in, below is a detail of my 32 Non-Express Tier submissions from June 2021 through January 2023.

Received a Completed/Ready for Pickup email for a grade only submission this morning, plus, with my daily "Print Invoice" review, saw some movement on August 22 submissions in "Bold" below.

CR = Comic ReHolder
EX = Expanded (now Vintage)
CN = Consumer (now Vintage Plus)
MD = Modern
NW = New
VN = Vintage
VT = Vintage Plus
PM = Premium

Some quick factoids on mid-2021 submissions:

33 Separate submissions
- 28 Press & Grade Submissions
- 1 VSP, Press & Grade Submission
- 4 Grade only Submissions

The longest TAT of my grade only was <51 wks or 244 Business days.
The longest TAT for combined Press & Grade was only 71 1/2 wks or 343 Business days.
The Shortest TAT for combined Press & Grade was 44 wks or 213 Busisness days.
The funny thing is, that both the longest and shortest TATs came from submissions that were delivered to CBCS on the same day on June 8th. [/b]

Delivered to CBCS on June 8th 2021 in two separate boxes. (All standard, w/out any FAST P's and one with VSP added).

5 of the 11 had press completed within 43wks,
1 of the 11 had press completed in 44wks,
1 of the 11 had press completed in 45wks,
1 of the 11 had press completed in 49wks,
1 of the 11 had press completed in <50wks,
1 of the 11 had press completed in <52wks.
1 of the 11 likely had press completed in ~52wks

#-----4D21-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT, In HeatSeal 5/24, In Grading Room 5/23, Just under 50 wks In Pressing Room.

#-----3BBA-MD 30 Comics - Ready for Pickup 4/20 = 45wk/217 Business day Combined Press & Grade TAT, In Labels 4/18, 45 wks in Pressing Room.

#-----1FC5-MD 30 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Grading Room 5/20, 49 wks in Pressing Room.

#-----0B3E-MD 60 Comics - Complete/Shipped 10/28 = 71 1/2wk/343 Business day Combined Press & Grade TAT, In Shipping 10/28, In Billing (credit) 10/28, In HeatSeal 10/7, In Labels 10/7, Officially in Grading 10/5 but press finished 8/1 or likely earlier, In Pressing Room. (per SteveRicketts Pressing Post#389, this has likely been pressed, just haven't received notification or dashboard update)

#-----FD6C-MD 101 Comics - Ready for Pickup 5/13 = 48wk/237 Business day Combined Press & Grade TAT, In Labels 5/10, In Grading Room 4/11, 44 wks in Pressing Room.

#-----DDAD-MD 31 Comics - Ready for Pickup 6/9 = 52wk/255 Business day Combined Press & Grade TAT,
In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/7, 43 wks in Pressing Room.

#-----943E-MD 26 Comics - Ready for Pickup 4/19 = 45wk/216 Business day Combined Press & Grade TAT, In Labels 4/11, In Grading Room 4/4, 43 wks in Pressing Room.

#-----905B-MD 30 Comics - Shipped 4/14 = 44wk/213 Business day Combined Press & Grade TAT, 4/13 Shipping, In Labels 4/12, In Grading Room 4/4, 43 wks in Pressing Room.

#-----7E7E-MD 30 Comics - Shipped 4/27 = 46wk/222 Business day Combined Press & Grade TAT, In Shipping 4/22, In Labels 4/18, In Grading Room 4/4, 43 wks in Pressing Room

#-----6C85-MD 30 Comics - Shipped 6/9 = 52wk/255 Business day Combined Press & Grade TAT, Shipping 6/8, In HeatSeal 5/24, In Labels 5/20, In Grading Room 4/5, 43 wks in Pressing Room.

#-----4259-MD 30 Comics w/2 VSP - Ready for Pickup 8/16 = 61 wk/291 Business day Combined Press & Grade TAT, In HeatSeal 8/11, In Labels 8/10, In Pressing Room. (per SteveRicketts Pressing Post#389, this likely had press completed in May or June, just hadn't received notification or dashboard update)


Delivered to CBCS 6/21/21
#-----C148-MD - 30 comics - Ready for Pickup 9/29 = 66wk or 322 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 5/31, Previously only mark Received, never marked In Pressing.


Delivered to CBCS 6/29/21
#-----6136-MD - 102 comics - Ready for Pickup 10/11 = 67wk or 324 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/27, In Billing 9/26, In Grading Room 6/8, Received

#-----82E4-MD - 34 comics - Ready for Pickup 9/28 = 65wk or 315 business day combined Press & Grade TAT, In HeatSeal 9/27, In Labels 9/26, In Grading Room 6/7, Received


Delivered to CBCS 7/6/21
#-----C197-MD - 21 comics - Ready for Pickup 9/16 = 62wk or 301 business day combined Press & Grade TAT[/b], In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/23, 50 wks / 240 Business day Press TAT.

#-----EB2E-MD - 30 comics - Completed/Shipped 10/24 = <68wk or 328 business day combined Press & Grade TAT, In Shipping 10/24, In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----E175-MD - 34 comics - Ready for Pickup 11/2 = 69wk or 335 business day combined Press & Grade TAT, In Grading (Pre-Shipping?) 11/1, In HeatSeal 10/31, In Labels 10/20, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----D6B1-MD - 32 comics - Completed/Ready for Pickup 11/10 = 70wk or 341 business day combined Press & Grade TAT, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/8, In HeatSeal 10/31, In Labels 10/29. In Grading notification 10/24 (press completed 8/1 or likely earlier),In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)


Delivered to CBCS 7/14/21
#-----19FC-MD - 30 comics - Completed/Shipped 10/28 = 67wk or 327 business day combined Press & GradeTAT, In Shipping 10/19, In QC 10/18, In HeatSeal 10/17, In Labels 10/14. In Grading notification 10/11,(press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----24FC-MD - 30 comics - Completed/Shipped 10/20 = 66wk or 321 business day combined Press & Grade TAT, In shipping 10/19, In HeatSeal 10/17, In Labels 10/14, In Grading notification 10/14 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)
#-----6D64-MD - 60 comics - Completed/Shipped 11/10 = 69wk or 335 business day combined Press & Grade TAT, In Shipping 11/09, Reverted back to "Grading", so probably will be in shipping in 1-2 business days 11/7, In HeatSeal 10/21, In Labels 10/20, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----7189-MD - 30 comics - Completed/Shipped 9/29 = 63wk or 304 business day combined Press & Grade TAT, In Shipping 9/23, In HeatSeal 9/23, In Labels 9/22, In Grading 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8142-MD - 68 comics - Completed/Shipped 10/25 = <68wk or 329 business day combined Press & Grade TATIn Shipping 10/24, In QC 10/24,In HeatSeal 10/19, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----8596-MD - 30 comics - Completed/Shipped 10/10 = <65wk or 311 business day combined Press & Grade TAT, in Shipping 10/10, In HeatSeal 10/6, In Labels 10/5, Officially In Grading 10/5 but finished press 8/1 or likely earlier, In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----A44C-MD - 60 comics - Completed/Shipped 11/07 = <69wk or 332 business day combined Press & Grade TAT, In Shipping 11/7In Shipping 11/7,[/b] Received another In Grading notification, so probably will be in shipping in 1-2 business days 11/3, Back to In HeatSeal 10/28, In Labels 10/24, In HeatSeal 10/22, In Labels 10/19, In Grading notification 10/18 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----B5DA-MD - 29 comics - Completed/Shipped 10/26 = 67wk or 324 business day combined Press & Grade TAT, In Shipping 10/25, In HeatSeal 10/20, In Labels 10/19, In Grading notification 10/19 (press completed 8/1 or likely earlier), In Pressing Room. (per SteveRicketts post that they are working on orders delivered Sept 2021, just haven't received notification or dashboard update)

#-----876C-EX - 30 comics - Ready for Pickup 9/16 = 61wk or 295 business day combined Press & Grade TAT, In HeatSeal 8/02, In Labels 7/29, In Grading Room 6/24, Received[/b]


Delivered to CBCS 9/20/21
#-----7374-MD - 8 comics Grade only/No Press - Completed/Ready for Pickup 9/12, In Labels 9/2, In Grading 7/16, Received - Total Grade only TAT = <51 wks or 244 Business days.

#-----6A82-MD - 18 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room - Total TAT w/Press = <51 weeks or 244 business days

#-----6A82-EX - 7 comics - Completed/Ready for Pickup 9/11, In HeatSeal 9/1, In Grading 8/31, another case of Pressing in less than a year with 49 wk movement. CBCS changed invoice back to "Received" 8/25, In Pressing Room 5/27, TAT w/Press = <51 weeks or 244 business days [/b]


Delivered to CBCS 2/24/22
#-----EAC8-CN - 2 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-EX - 11 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----EAC8-MD - 17 comics - Completed/Shipped 2/6 = 49wk or 235 business day combined Press & Grade TAT, In Shipping 2/6, In HeatSeal 2/2, In Labels 1/27, In Grading 1/24, Moved to "Received" 1/20, In Pressing Room

#-----B5B6-MD - 12 comics Grade only - Completed/Ready for Pickup 2/8 = 49wk or 237 business day Grade only TAT, Reverted back to "Grading" with Graded email 1/23, In HeatSeal 1/19(no notification), In Grading email 01/18

#-----BD64-EX - 2 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----BD64-MD - 39 comics - In Labels 2/16, In Grading 2/15, In Pressing Room

#-----8043-MD w/VSP - 14 comics - Completed/Ready for Pickup 2/8 = 49wk or 237 business day combined VSP, Press & Grade TAT, In Billing 2/8, In HeatSeal 2/6, In Labels 2/3, In Pressing Room


Delivered to CBCS Friday 08/19/22
#-----A0CC-PM - 1 comic - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Labels 11/22, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A0CC-VT - 2 comics - Completed/Ready for Pickup 11/22 = 13wk or 65 business day combined Press & Grade TAT, In Grading 11/16, In Pressing Room 8/22, Received 8/22

#-----A734-VN - 5 comics - Completed/Ready for Pickup 12/16 = 16wk or 81 business day combined Press & Grade TAT, In Grading 11/15, In Pressing Room 8/22, Received 8/22

#-----A2F1-MD - 32 comics - In HeatSeal 3/13, In Labels 3/10, In Grading 3/9, In Pressing Room 8/22, Received 8/22

#-----7372-MD - 10 comics - Completed/Ready for Pickup 3/10 = 29wk or 138 business day combined Press & Grade TAT , In HeatSeal 3/8, In Labels 3/7, In Grading 3/6, In Pressing Room 8/22, Received 8/22

#-----703D-MD - 12 comics - Completed/Ready for Pickup 3/7 = 28 1/2wk or 135 business day combined Press & Grade TAT, In HeatSeal 3/02, In Labels 3/01, In Grading 2/20, In Pressing Room 8/22, Received 8/22

#-----786C-MD - 20 comics / Grade only - Completed/Ready for Pickup 3/13 = 29 1/2wk or 139 business day Grade only TAT, In HeatSeal 3/8, In Labels 3/7, In Grading 3/06, Received 8/22

#-----7A3B-MD - 14 comics - In HeatSeal 3/9, In Labels 3/8, In Grading 3/8, In Pressing Room 8/23, Received 8/23

#-----A5EC-RH - 4 comics / ReHolder - Ready for Pick-up 9/6, In Labels 8/23, Received 8/23

#-----8803-RH - 4 comics / ReHolder - Completed/Shipped 9/6, In Shipping 9/2, In Labels 8/26, Received 8/23


Delivered to CBCS Friday 12/09/22
#-----79FE-MN - 32 comics - In Pressing area 12/13, Received 12/13


Delivered to CBCS Tuesday 1/03/2023
#-----C0E9-CR - 1 comic ReHolder - Completed/Shipped 1/10, Received 1/6

#-----AD21-CR - 6 comics ReHolder - Completed/Ready for Pickup 1/11, Received 1/3

#-----DBB5-VN - 6 comics - Completed/Ready for Pickup 2/16 = only 6wk or 31 business day combined Press & Grade TAT...WOW!, In HeatSeal 2/14, In Grading 2/10 (that's a 5 wk or 27 business day Press TAT), In Pressing area 1/6, Received 1/6

#-----D581-MD - 6 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-MD - 15 comics - In Pressing area 1/4, Received 1/4

#-----5F7A-NW - 5 comics - In Pressing area 1/4, Received 1/4


Delivered to CBCS 11/15/2021 (Yes, 2021. This is a submission of 66 Magazines that were sent to Joe at CFP Comics for Pressing and he was going to re-forward to cgc for grading. After a conversation with Steve Borock, I decided to have CFP send to CBCS as I was not in a hurry to have them back and 5 1/2 dozen would be a good batch for CBCS to run through and iron out the process of Magazine encasement. "Test Dummies" is how I referred to them. Thank you again Joe for your agreeing to alter the forwarding after you completed your Pressing services. Well, there has been movement at CBCS this past week.)

#-----D0D2-MAG - 66 magazines VSP and Grade only - In Labels 2/28, In Grading 2/26, 2/16 Reverted to Received, 2/10 in ImagingSP (Probably for VSP), 2/10/23 Official Received email from CBCS.

I will continue to update until completed.
Post 642 IP   flag post
I had no way of knowing that 9.8 graded copies signed by Adam Hughes weren't what you were looking for. drchaos private msg quote post Address this user
My three invoices from April 2022 (roughly 250 books total) have been graded and are now in the encapsulation process.
Post 643 IP   flag post
Collector Paul_G private msg quote post Address this user
So they do seem to be getting faster.
Got an email Friday that my August 2022 submission was going into grading --it had a surprise signature to verify, but that seemed to only slow things a week). (Modern --regular speed, no pressing)
Yesterday got an email my Sept 2022 submission was going into grading.

Just checked the Tracker and it says both are done grading and into processing (I don't necessarily believe that, but interesting)...

Regardless, the TAT seems to be picking up.
Post 644 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Modern w/Press

Received: 1/12/22, Complete: 2/1/23 (385 total days)
Received: 2/15/22, Complete: 2/21/23 (371 total days)
Received: 3/12/22, Complete: 3/2/23 (355 total days)
Received: 3/31/22, ImagingSP: 2/15/23, Pressing: 2/21/23, Received: 3/3/23, Grading: 3/15/23, Labels: 3/15/23
Received: 3/13/23, Pressing 3/15/23


Modern & New (grade only)

Received: 5/24/22, Complete: 2/7/23 (259 total days)
Received: 5/27/22, Grading: 2/14/23, Heat Seal: 2/15/23
Received: 6/15/22, Complete: 2/10/23 (240 total days)
Received: 7/18/22, Complete: 2/14/23 (211 total days)
Received: 8/16/22, Complete: 2/10/23 (178 total days)
Received: 3/13/23


Vintage (grade only)

Received: 2/15/23, Complete: 3/3/23 (16 total days)
Received: 2/15/23, Complete: 2/23/23 (8 total days)
Received: 3/13/23
Post 645 IP   flag post
Collector Element_Lad private msg quote post Address this user
I have had six orders completed this week. Two have shipped and four are awaiting shipping now. All are from last year. The earliest was submitted on 6/29 and the latest on 09/23. All regular TATs. Four more are in Labelling or Heat Seal.
Post 646 IP   flag post
Collector PeteN private msg quote post Address this user
Hi folks. Does anyone have an idea how long VSP is right now for a 1975 book? I see the turn around times for the different tiers, but I don't see the time for VSP. Just curious what's the estimate before I turn in books. Thank you!
Post 647 IP   flag post
If the viagra is working you should be well over a 9.8. xkonk private msg quote post Address this user
@PeteN typically about a week.
Post 648 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Modern w/Press

Received: 1/12/22, Complete: 2/1/23 (385 total days)
Received: 2/15/22, Complete: 2/21/23 (371 total days)
Received: 3/12/22, Complete: 3/2/23 (355 total days)
Received: 3/31/22, ImagingSP: 2/15/23, Pressing: 2/21/23, Received: 3/3/23, Grading: 3/15/23, Labels: 3/15/23, Heat Seal: 3/16/23
Received: 3/13/23, Pressing 3/15/23


Modern & New (grade only)

Received: 5/24/22, Complete: 2/7/23 (259 total days)
Received: 5/27/22, Grading: 2/14/23, Labels: 2/14/23, Heat Seal: 2/15/23
Received: 6/15/22, Complete: 2/10/23 (240 total days)
Received: 7/18/22, Complete: 2/14/23 (211 total days)
Received: 8/16/22, Complete: 2/10/23 (178 total days)
Received: 3/13/23


Vintage (grade only)

Received: 2/15/23, Complete: 3/3/23 (16 total days)
Received: 2/15/23, Complete: 2/23/23 (8 total days)
Received: 3/13/23, Grading: 3/16/23, Labels: 3/16/23, Heat Seal: 3/16/23
Post 649 IP   flag post
Collector PeteN private msg quote post Address this user
Quote:
Originally Posted by xkonk
@PeteN typically about a week.
Thank you!
Post 650 IP   flag post
I blame the forum gremlins. figment private msg quote post Address this user
Modern w/Press

Received: 1/12/22, Complete: 2/1/23 (385 total days)
Received: 2/15/22, Complete: 2/21/23 (371 total days)
Received: 3/12/22, Complete: 3/2/23 (355 total days)
Received: 3/31/22, ImagingSP: 2/15/23, Pressing: 2/21/23, Received: 3/3/23, Grading: 3/15/23, Labels: 3/15/23, Heat Seal: 3/16/23, Production: 3/17/23, Complete: 3/17/23 (351 total days)
Received: 3/13/23, Pressing 3/15/23


Modern & New (grade only)

Received: 5/24/22, Complete: 2/7/23 (259 total days)
Received: 5/27/22, Grading: 2/14/23, Labels: 2/14/23, Heat Seal: 2/15/23
Received: 6/15/22, Complete: 2/10/23 (240 total days)
Received: 7/18/22, Complete: 2/14/23 (211 total days)
Received: 8/16/22, Complete: 2/10/23 (178 total days)
Received: 3/13/23


Vintage (grade only)

Received: 2/15/23, Complete: 3/3/23 (16 total days)
Received: 2/15/23, Complete: 2/23/23 (8 total days)
Received: 3/13/23, Grading: 3/16/23, Labels: 3/16/23, Heat Seal: 3/16/23
Post 651 IP   flag post
Staple topics, nice. makahuka private msg quote post Address this user
Submitted some books at WonderCon 2022, and received my tracking information a few days ago, just before WonderCon 2023, woohoo!
Post 652 IP   flag post
Moderator Jesse_O private msg quote post Address this user
This is from the CBCS Facebook page.


Post 653 IP   flag post
Collector xvipah private msg quote post Address this user
I heard back from CS today finally. They have apparently misplaced my 2 books. Which I guess is why it took so long for them to get back to me in any form, cause they were trying to find them.

I'm glad they told me, and I've asked for a refund instead of grading credit. Since they weren't super expensive books I'm not too fussed about it:
Harley Quinn #1 (2000)
Marvel Super Heroes #8 (1st Squirrel Girl)


Quote:
Originally Posted by xvipah
I gave them to the end of last week, and even through yesterday. No response from CS... again. So, I've once again emailed them asking for a status, we'll see how it goes.
Post 654 IP   flag post
No rust here... Nearmint67 private msg quote post Address this user
Wow, they are really starting to get it together over there...
Consistent quick email and phone communications over the last week and today.
Also, January submission of 30 new and moderns (grade only) are in the grading room and should be completed this week. Yeah...
Post 655 IP   flag post
600887 991 30
Log in or sign up to compose a reply.